Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Wings - 2


Fuel Drain - inside view

Fuel Drain - Outside view.

Fuel filler and fuel vent line detail.

Vent line plunbing.  Pitot line plumbing.

Fuel guage sender trial fit using cardboard model.

Preparing one wing for closeout.

Wing Closeout.  Hope that was enough weight. WOW

Navigation antenna mounted on plywood frame.

Nav antenna installation detail.

Nav antenna installation detail.


Fuel Sensor Installation