Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Fuselage


What do you mean we have to put it
together?  You forgot to tell me!


Now I know why they left this stuff for
us to peel off!

Looking like an airplane now.


Fuel Control Valve - Top in place


Fuel Control Valve - Black Squares are
Velcro to Hold Top Down


Baggage Area with Covers over Flap Torque
Tubes (for safety).  Foam + 1Ply Glass

Baggage Comp Bulkhead.  Artist Foam Bd
with 1 Layer Glass on Fwd Side.


Finished Air Vent