Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Windows / Windshield Installation

New windshield joggle - on the inside, so
windshield can be installed from outside.

Clamps to hold windshield in place.
Used lightweight sandbags to hold it down.

Making inside joggle to permit installing
windshield from the outside.  
3-Ply layup - 3" side.  White area is micro
flox fillit for smooth transition. Windshield Edge
was covered with packaging poly tape.

Rear window installation with wooden
clamping blocks & drywall screws
from the outside.

Window Installation  - big clamp at the
bottom is big overkill.

Preparation for windshield installation.