Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Landing Gear


Main Gear

Drilling the Gear Mounting Holes
Drilling the gear mounting holes.

A bit of finish sanding.

Mount points for the landing gear.

Definately the easiest way to mount the gear.

Main Gear in place.


Nose Gear Installation.
Reinforced nose gear.  Welded plates on
both side to stiffen the strut.
Yellow Custom made spacer for nose gear.
 Just snugs up to the lower wheel bearing.

Front of Stich welded
reinforcement plates.
Gear Installed -
First Time / Last?
Aluminum fairing to hide
ugly reinforcement plates.