Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Instrument Panel

Dust Cover
with Aluminum
Defroster &
Radio Heat
Vents
Radio &
Transponder
Tray Supports
& Panel
Stiffener
Permanently
Installed
Panel
Wiring  MESS!
Semi-Finished
Panel &
Cockpit. Still
net to install
leather side panels.  
(After fitting
wing & fairings)
Finished dust cover
 with 2 defrost & 1
 radio heat vent.

Actual cover color
is a bit darker