Don Garret & Jim Lagowski - TR-1 Construction

Note:  Some of these sections are large with quite a few photos.  
               They may take an extend time to load.  Please be patient.
       Fuselage  

Fuselage 2

 Engine / Firewall           Flaps        
       Ailerons        Horz Stabilizer 1    Horz Stabilizer 2    Landing Gear    
 Rudder/VertStab          Elevator 1       Elevator 2            MAIN
        Controls

Wiring Conduit

Windows/Windshield

Cowling

Doors

Engine Baffle

Instrument Panel

Wheel Fairings

Wings

Wings 2   

Wings 3

Wings 4

Moving Workshops

In The Beginning

Pre-Finish +

Fuselage Dolly


Pre-Finish + Misc.

Heater - Defrost ass'y inside firewall with home made gate valve (Valve is open) Valve is Closed (i.e. No Defrost heat.)

First Time at the Airport Goodbye Workshop.

Wing Assembly Added

Tips, ailerons & flaps installed. Stripes and # to come.
Upper fairing overall. Front of upper fairing.  I didn't cut.  Can bend then wing goes on & then screw fron section in place.  Back portion is floxed in place.
Lower rear fairing - a real pain to fit.  Needed access hole for rear spar bolt. Foam Seats.  Used an electric knife to trim & 3M spray adheasive to stick pieces together.